Boiler House Wall Type:Framed the last resident left in
Pay in 4 interest-free payments of $25.00 Learn more
Shipping Estimate
USA
- USA
- CAN
- USA
- CAN
Ships within 48 hours · Estimated delivery Aug 9 - Aug 14
Live Spec
Boiler House Wall Type:Framed the last resident left inA boiler house wall at Portland Cement Works rises through the frame, its surface stripped back to rust patterns and peeling grey paint accumulated across decades of operation. The boiler house sits within the Federation era Powerhouse, a structure central to the works that drove cement production from 1902 until closure in November 1991. Part of the Portland Cement Works series.
Store: juliusking.com · Domain: juliusking.com

























